Sign In | Join Free | My ledscreensign.com |
|
Brand Name : Sussman
Model Number : SS-GR
Certification : CE, SGS, ISO
Place of Origin : China (mainland)
MOQ : 1 set
Price : negotiable
Payment Terms : T/T L/C
Supply Ability : 9 sets per month
Delivery Time : 65 working days after deposit
Packaging Details : Standard package with film, plastic and steel wire. (or customized)
Material thickness : 1mm--4mm
Forming Stations : 15 stations
Power supply : 380V, 50Hz, 3Phase(or customized)
Material : Galvanized color sheet
Dirve system : gearbox dirving
Machine weight : about 8 tons
Guard railway roll forming machine
Guardrail Roll Technical Parameter
Guardrail Roll Main Components
| Quantity |
3T hydraulic un-coiler | 1 set |
Feeding and leveling device | 1 set |
Main roll forming machine 15 stations drived by gear box
| 1 set |
Hydraulic station | 1 set |
Control system (including control box) | 1 set |
Out tables | 2 sets |
Punching Device | 2 sets |
Working Flow of Guardrail Roll
A. Passive Decoiler..........................................................To load and uncoiling material
(We also have Electric Decoiler and Hydraulic Decoiler to hold the heavy material.)
B. Servo Feeding Applicator............................................To feed the material accurately
C. Hydraulic/Press Punching...........................................To punch as requirements
D. Roll Forming Unit.........................................................To roll form as requirements
E. Hydraulic Cutting.........................................................To cut sheets as desired length
(We also have non-stop hydraulic cutting system.)
F. Output Table................................................................Support the finished products
Standard Profile Drawing
Photo Gallery
After-sale Serive
- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
![]() |
PLC Touch Screen Control Galvanized Color Sheet Roll Former Machine Gearbox Driving Images |